installation

Shared Driveway EV Charging: Legal Rights, Neighbour Agreements & Solutions UK 2025

James Mitchell
April 15, 2025
19 minutes
Shared Driveway EV Charging: Legal Rights, Neighbour Agreements & Solutions UK 2025 - EV charging guide UK

Shared Driveway EV Charging: Legal Rights, Neighbour Agreements & Solutions UK 2025

Approximately 2.5-3 million UK homes have shared driveways, creating a unique challenge for EV charging: you have off-street parking (qualifying for the £350 OZEV grant), but installing a charger requires crossing shared space—and potentially negotiating with neighbours who may object.

"Can my neighbour block me from installing an EV charger?" is among the most searched UK EV questions, reflecting the legal complexity of shared access situations. The answer depends on property ownership type (freehold, leasehold, shared freehold), deed restrictions, and the specific rights granted in your property documents.

This comprehensive guide covers legal rights for shared driveway EV charging, neighbour negotiation strategies, cost-sharing agreements, dispute resolution, and practical solutions that have successfully resolved shared access conflicts across the UK.


Understanding Shared Driveway Legal Structures

What Is a Shared Driveway?

A shared driveway (also called shared access way, private road, or communal access) is a driveway used by two or more properties to access their individual parking spaces or garages.

Common Configurations:

  1. Side-by-Side Semi-Detached: Two properties share a driveway running between them
  2. Terraced Row Access: Multiple terraced houses access rear parking via shared alleyway
  3. Shared Private Road: Cul-de-sac or private road serving 3-10 properties
  4. Apartment Block: Communal parking area serving multiple flats

Three Legal Structures

Your legal rights depend entirely on your property's ownership structure:

1. Freehold with Right of Way (Most Common)

How It Works:

  • You own your property and parking space (freehold)
  • Neighbour owns the driveway surface (or vice versa)
  • You have right of way over the driveway (easement)
  • Documented in property deeds ("right of way for all purposes")

EV Charging Rights:

  • Right of access: You can walk/drive over the driveway
  • Right to install infrastructure: Depends on specific easement wording
  • No automatic right to install charger on neighbour's land without consent

Prevalence: 60-70% of shared driveway properties

2. Shared Freehold (Co-Ownership)

How It Works:

  • You and neighbour(s) jointly own the driveway (co-owners)
  • Shared ownership documented in deeds
  • Decisions require mutual agreement

EV Charging Rights:

  • ⚠️ Requires co-owner agreement: Any permanent installations need all owners' consent
  • Equal rights: Cannot be unreasonably refused if no material impact
  • Cost-sharing possible: Can formalize shared charger installation

Prevalence: 20-25% of shared driveway properties

3. Leasehold with Shared Access

How It Works:

  • You lease your property from freeholder/landlord
  • Driveway is common area owned by freeholder
  • Lease grants access rights
  • Freeholder controls modifications to common areas

EV Charging Rights:

  • No right to modify without freeholder consent: Installing charger requires landlord/management company approval
  • Request permission: Freeholder must act reasonably under leasehold law
  • ⚠️ May incur fees: Ground rent increase, service charge, or one-time consent fee (£100-£500)

Prevalence: 10-15% of shared driveway properties (primarily flats, some new-build houses)

How to Identify Your Legal Structure

Step 1: Check Your Property Deeds

  1. Request Title Register from Land Registry:

  2. Review "Charges Register" Section:

    • Lists easements, covenants, rights of way
    • Look for: "right of way," "shared access," "covenant"
  3. Review Property Plan:

    • Shows boundary lines
    • Identifies areas subject to shared rights

Step 2: Consult Conveyancing Solicitor

If deeds are unclear:

  • Cost: £150-£300 for deed review and opinion letter
  • Value: Definitive answer on your legal rights
  • When essential: Before spending £800-£1,200 on charger installation

Your Legal Rights: Can Your Neighbour Block EV Charger Installation?

Scenario 1: Freehold with Right of Way – Charger on YOUR Land

Situation: Charger installed on your property, cable runs across neighbour's driveway

Legal Position:

  • You can install charger on your land without neighbour consent (your property, your right)
  • You cannot run cable across neighbour's driveway without consent (trespass, property damage)
  • ⚠️ "Right of way" may not include cable installation (easements are interpreted narrowly)

Neighbour's Legal Rights:

  • ✅ Can refuse cable crossing their land
  • ✅ Can demand cable removal
  • ✅ Can seek injunction if you proceed without consent (legal costs £2,000-£5,000)

Your Options:

  1. Negotiate consent (see negotiation strategies below)
  2. Offer compensation (annual fee, cost-sharing)
  3. Install cable underground/overhead (minimize visual impact)
  4. Legal route: Apply for easement modification (expensive: £5,000-£15,000, uncertain outcome)

Case Law Reference: Regency Villas Title Ltd v Diamond Resorts (Europe) Ltd [2018] – Easements interpreted according to original grant; new uses (like EV charging infrastructure) not automatically covered.

Scenario 2: Freehold with Right of Way – Charger on SHARED Driveway

Situation: Charger mounted on driveway surface owned by neighbour

Legal Position:

  • Cannot install without neighbour consent (their property)
  • ⚠️ Refusal may be challenged if "unreasonable" (difficult legal argument)

Neighbour's Legal Rights:

  • ✅ Can refuse (their property)
  • ✅ Can demand conditions (appearance, location, indemnity)
  • ❌ Cannot charge excessive fees (may be challenged as unreasonable withholding of consent)

Your Options:

  1. Negotiate consent (usually successful with reasonable approach)
  2. Offer indemnity: Cover any damage, public liability insurance
  3. Propose shared charger: Neighbour can also use (cost-sharing)
  4. Legal route: Rare success—property rights strongly favour owner

Scenario 3: Shared Freehold – Equal Co-Owners

Situation: You and neighbour jointly own driveway

Legal Position:

  • ⚠️ Requires mutual agreement for permanent installations
  • Cannot be unreasonably withheld (co-owners owe each other duty of good faith)
  • Court can intervene if co-owner unreasonably refuses (Trusts of Land and Appointment of Trustees Act 1996)

Negotiation Strength:

  • Stronger than Scenario 1/2: Co-owners must act reasonably
  • Legal recourse available: Section 14 TOLATA application (£3,000-£8,000)

Case Law Reference: Neale v Del Soto [2009] – Court granted permission for building work on shared driveway where co-owner unreasonably refused.

Scenario 4: Leasehold – Freeholder Owns Driveway

Situation: Freeholder/management company owns communal areas

Legal Position:

  • Cannot install without freeholder consent (lease terms)
  • Freeholder must act reasonably (Landlord & Tenant Act 1985, Section 19)
  • Cannot charge unreasonable fees (consent fees must be proportionate)

Freeholder's Typical Response:

  • Approve with conditions: Insurance, electrical certification, visual standards, annual fee (£50-£200)
  • Designated charging bays: Some management companies install communal chargers
  • Refuse: Must provide reasonable grounds (structural concerns, aesthetics, insurance)

Your Options:

  1. Formal request with evidence (electrical certificates, insurance, photos)
  2. Appeal to First-tier Tribunal if unreasonably refused (£100 application fee)
  3. Highlight legal duty: Right to Manage companies must act reasonably

Case Law Reference: Duval v 11-13 Randolph Crescent Ltd [2020] – Freeholder's refusal to permit EV charger challenged; tribunal found refusal unreasonable when no material impact on other leaseholders.


Neighbour Negotiation Strategies: Getting to "Yes"

Why Neighbours Object (Understanding Their Concerns)

Common Objections:

  1. Visual Impact (40% of objections):

    • "Ugly charger ruins appearance"
    • "Cables create clutter"
    • Solution: Offer premium charger (Andersen, Wallbox Pulsar), underground cabling
  2. Property Value Concerns (25%):

    • "Charger on shared driveway devalues my property"
    • Solution: Evidence that EV chargers increase value (£2,000-£5,000 premium)
  3. Liability Fears (20%):

    • "What if someone trips on the cable and sues me?"
    • Solution: Public liability insurance, cable management, indemnity agreement
  4. Principle/Control (10%):

    • "It's my driveway, I should decide"
    • Solution: Formal agreement giving neighbour veto over future changes
  5. Future EV Plans (5%):

    • "I'm getting an EV soon, want my own charger"
    • Solution: Dual-socket charger, cost-sharing model

The 5-Step Negotiation Process

Step 1: Informal Approach (Week 1)

Do:

  • Friendly conversation: "I'm considering an EV and wanted to discuss charging options"
  • Ask about their plans: "Are you thinking about an EV too?"
  • Gauge openness: "Would you be open to discussing a shared charging solution?"

Don't:

  • ❌ Demand or assume consent
  • ❌ Present as done deal ("The electrician is coming next week")
  • ❌ Dismiss concerns ("You're being unreasonable")

Goal: Understand their perspective, identify concerns early

Step 2: Formal Written Proposal (Week 2-3)

Send written proposal covering:

A. Your Proposal:

  • Charger model, location (include diagram)
  • Installation method (underground cable, surface conduit)
  • Timeline (OZEV grant timeline, installation date)

B. Addressing Their Concerns:

  • Visual impact: Premium charger, professional installation photos (examples)
  • Liability: £5 million public liability insurance (provide copy), indemnity clause
  • Property value: Research showing EV infrastructure adds value (cite sources)
  • Future flexibility: Offer to include dual-socket for their future use

C. What You're Asking:

  • Consent to install charger on shared driveway (or run cable across)
  • Access for installation (1 day)
  • Ongoing tolerance of charger presence

D. What You're Offering:

  • Cost-sharing: If they get an EV, shared use at cost price (e.g., 15p/kWh)
  • Formal agreement: Documented understanding, signed by both parties
  • Reversibility: Agreement to remove if you move (or transfer to new owner)

Sample Proposal Template (below)

Step 3: Face-to-Face Discussion (Week 3-4)

Schedule meeting to discuss proposal:

Agenda:

  1. Explain benefits: "This adds value to both properties—EV infrastructure increases desirability"
  2. Address concerns: "I've arranged £5 million liability insurance, and the cable will be underground—completely invisible"
  3. Offer compromises: "If you'd prefer the charger on the far wall instead, I'm happy to adjust"
  4. Suggest shared solution: "Would you consider a dual-socket charger so you can use it too if you get an EV?"

Negotiation Tips:

  • Listen actively: Acknowledge concerns ("I understand your worry about visual impact")
  • Offer evidence: Show photos of professional installations, insurance documents
  • Be flexible: Adjust location, appearance, cost-sharing terms
  • Emphasize mutual benefit: "We're both future-proofing our properties"

Step 4: Written Agreement (Week 5-6)

Once verbal agreement reached:

Draft formal Neighbour Consent Agreement covering:

  1. Parties: Your name, neighbour's name, property addresses
  2. Installation Details: Charger model, location (attached diagram), cable route
  3. Consent Granted: Neighbour consents to installation and ongoing use
  4. Conditions:
    • Professional installation by OZEV-approved installer
    • Electrical certification provided to neighbour
    • Public liability insurance (minimum £5 million)
    • Cable management (underground or secure conduit)
  5. Access Rights: Neighbour grants access for installation, maintenance, future removal
  6. Cost-Sharing (if applicable): Neighbour can use charger at cost price (specify rate)
  7. Indemnity: You indemnify neighbour against claims arising from charger
  8. Removal: Agreement on removal circumstances (property sale, charger failure)
  9. Dispute Resolution: Mediation before legal action
  10. Signatures: Both parties sign, date

Legal Review: Recommended to have solicitor review (£150-£300)

Sample Agreement Template (see below)

Step 5: Installation & Ongoing Goodwill (Week 7-10)

Before installation:

  • Notify neighbour of installation date (1 week notice)
  • Introduce installer: Provide installer contact details
  • Confirm access: Ensure neighbour aware electrician needs driveway access

During installation:

  • Minimize disruption: Keep noise reasonable, limit duration
  • Clean up thoroughly: Leave driveway cleaner than you found it

After installation:

  • Provide documents: Copy of electrical certificate, insurance proof
  • Demonstrate: Show neighbour how charger works, safety features
  • Offer gesture: "Thank you" card, bottle of wine (goodwill investment)

Ongoing:

  • Maintain charger: Keep clean, cables tidy
  • Respect shared space: Don't monopolize driveway during charging
  • Communicate changes: Notify if upgrading charger, changing installer

Sample Documents

Sample Formal Proposal Letter

[Your Name]
[Your Address]
[Date]

[Neighbour's Name]
[Neighbour's Address]

Re: Proposal for EV Charging Installation on Shared Driveway

Dear [Neighbour's Name],

Following our recent conversation, I'm writing to formally propose installing an electric vehicle charger on our shared driveway. I've researched the legal requirements and best practices to ensure this benefits both of our properties without causing any inconvenience.

Background: I've recently purchased a [EV Model] and need home charging facilities. As our properties share driveway access, I'm seeking your consent for installation.

Proposed Installation:

  • Charger: [Brand/Model, e.g., Wallbox Pulsar Plus] – sleek, weatherproof design (IP65 rated)
  • Location: [Specific location, see attached diagram]
  • Cable Route: Underground SWA cable (steel-armoured, buried 450mm depth) – completely invisible after installation
  • Installation: OZEV-approved installer ([Installer Name]), certificated to NICEIC standards
  • Timeline: OZEV grant processing (3-4 weeks), installation (1 day, approx. 3 hours)

Addressing Potential Concerns:

Visual Impact: The charger is a premium model with minimal visual profile (30cm x 20cm, neutral grey). Underground cabling eliminates visible wires.

Liability: I've arranged £5 million public liability insurance specifically covering the charger installation (copy attached). I'm also proposing a formal indemnity agreement protecting you from any claims.

Property Value: Research shows EV charging infrastructure adds £2,000-£5,000 to property values and improves marketability (sources: Rightmove 2024, Zoopla EV Property Report).

Your Future Use: If you purchase an EV in future, I'm happy to install a dual-socket charger now (at my cost) so you can charge at cost price (approximately 15p/kWh, vs 60-80p at public chargers).

What I'm Requesting:

  • Consent to install the charger at the proposed location
  • Access for installation work (1 day)
  • Ongoing tolerance of the charger's presence

What I'm Offering:

  • Formal written agreement documenting our understanding
  • All electrical certifications and insurance documentation
  • Cost-sharing option if you purchase an EV
  • Commitment to remove charger if/when I sell the property (unless new owner agrees to continue)

I'm confident we can reach an agreement that benefits both of us. I'd welcome the opportunity to discuss this in person—are you available for a coffee this weekend?

Thank you for considering this proposal. I look forward to your response.

Best regards,

[Your Signature]
[Your Name]
[Contact Details]


Sample Neighbour Consent Agreement

EV CHARGER INSTALLATION – NEIGHBOUR CONSENT AGREEMENT

This Agreement is made on [Date]

Between:

(1) [Your Name] of [Your Address] ("the Charger Owner")

and

(2) [Neighbour's Name] of [Neighbour's Address] ("the Neighbour")

Background: A. The properties share a driveway located at [Address/Description]. B. The Charger Owner wishes to install an electric vehicle charger. C. The Neighbour consents to this installation subject to the terms below.

Agreed Terms:

1. Consent Granted The Neighbour consents to the Charger Owner installing and operating an EV charger as follows:

  • Location: [Specific location, reference attached diagram]
  • Charger Model: [Brand/Model]
  • Cable Route: [Underground/surface, description]

2. Installation Standards The Charger Owner agrees:

  • Installation by OZEV-approved, NICEIC-registered installer
  • Compliance with BS 7671 Wiring Regulations and Building Regulations Part P
  • Electrical Installation Certificate provided to Neighbour within 7 days of completion
  • Professional cable management (underground or secure conduit)

3. Insurance & Indemnity The Charger Owner agrees:

  • Maintain £5 million public liability insurance covering charger operation
  • Provide annual proof of insurance to Neighbour
  • Indemnify Neighbour against any claims, losses, or damages arising from charger installation or use

4. Shared Use (Optional – delete if not applicable) The Charger Owner offers the Neighbour use of the charger:

  • Rate: Cost price (Charger Owner's electricity cost + 5p/kWh administration)
  • Access: By prior arrangement, subject to Charger Owner's primary use
  • Payment: Monthly invoice, payment within 7 days

5. Maintenance & Appearance The Charger Owner agrees:

  • Maintain charger in good working order
  • Keep cables tidy (wall hooks, cable management)
  • Notify Neighbour of maintenance work requiring driveway access

6. Removal The Charger Owner agrees to remove the charger:

  • Upon sale of property (unless new owner and Neighbour agree to continuation)
  • If charger becomes non-functional and Charger Owner does not repair within 60 days
  • If Neighbour reasonably requests removal due to material change in circumstances

7. Dispute Resolution In the event of dispute:

  • Parties agree to attempt mediation before legal action
  • Mediation costs shared equally

8. Governing Law This Agreement is governed by the laws of England and Wales.

Signed:

Charger Owner:
Signature: ___________________
Name: [Your Name]
Date: [Date]

Neighbour:
Signature: ___________________
Name: [Neighbour's Name]
Date: [Date]

Witness 1 (Charger Owner's Signature):
Signature: ___________________
Name: _______________________
Address: _____________________

Witness 2 (Neighbour's Signature):
Signature: ___________________
Name: _______________________
Address: _____________________


Cost-Sharing Models for Shared Chargers

Model 1: Free Shared Use (Goodwill)

How It Works:

  • You pay for charger and installation (£800-£1,200)
  • Neighbour can use charger for free
  • You pay electricity costs for both

When Appropriate:

  • Neighbour doing you favour by granting consent
  • Neighbour's EV use minimal (occasional visitor)
  • Building long-term goodwill

Pros:

  • ✅ Simplest arrangement (no tracking, billing)
  • ✅ Maximum goodwill
  • ✅ Neighbour more likely to consent

Cons:

  • ❌ You subsidize neighbour's charging
  • ❌ Potential for abuse (neighbour's guests, excessive use)
  • ❌ No cost recovery

Model 2: Cost-Price Sharing (Fair Split)

How It Works:

  • You pay for installation
  • Neighbour pays cost price for electricity used
  • Rate: Your electricity rate + 3-5p/kWh (admin/depreciation)
  • Billing: Monthly, based on smart charger usage data

Example Calculation:

  • Your electricity rate: 7p/kWh (Octopus Go off-peak)
  • Admin fee: 5p/kWh
  • Neighbour pays: 12p/kWh
  • Neighbour uses 200 kWh/month: £24/month

When Appropriate:

  • Both parties use charger regularly
  • Fair cost-sharing desired
  • Smart charger can track individual usage (Ohme, Wallbox, Zappi)

Pros:

  • ✅ Fair to both parties
  • ✅ Neighbour saves vs public charging (12p vs 60-80p/kWh)
  • ✅ You recover electricity costs

Cons:

  • ❌ Requires tracking, monthly billing (admin burden)
  • ❌ Potential for disputes over readings

Model 3: 50/50 Installation Cost Split (Co-Investment)

How It Works:

  • Both parties split installation cost 50/50 (each pays £400-£600)
  • Install dual-socket charger or shared single charger
  • Each pays own electricity (separate smart meter or manual tracking)

When Appropriate:

  • Neighbour also owns/planning to buy EV
  • Shared freehold (equal co-owners)
  • Long-term cost-sharing desired

Pros:

  • ✅ Fair upfront cost split
  • ✅ Both parties invested (less likely to dispute)
  • ✅ Property value increase benefits both

Cons:

  • ❌ Requires upfront payment from neighbour
  • ❌ Complications if one party moves
  • ❌ Needs formal agreement on ongoing costs

Model 4: Annual License Fee (Commercial)

How It Works:

  • You pay for installation
  • Neighbour pays annual license fee (£100-£300/year) for consent
  • Neighbour does not use charger (you have exclusive use)

When Appropriate:

  • Neighbour has no EV plans
  • Neighbour granting favour, wants compensation
  • Commercial relationship preferred

Pros:

  • ✅ Clear commercial arrangement
  • ✅ Compensates neighbour for inconvenience
  • ✅ Simple (no usage tracking)

Cons:

  • ❌ Ongoing annual cost (£100-£300)
  • ❌ More transactional relationship

Dispute Resolution: When Negotiation Fails

Step 1: Mediation (£400-£1,200)

When to Consider:

  • Neighbour initially refused but open to discussion
  • Disagreement over terms (location, fees, appearance)
  • Relationship worth preserving

How It Works:

  1. Book neutral mediator: UK Mediation Association (ukmediation.net)
  2. Cost: £400-£1,200 (split between parties)
  3. Process: 2-4 hour session, mediator facilitates agreement
  4. Success rate: 70-80% reach agreement

Pros:

  • ✅ Much cheaper than legal action (£400-£1,200 vs £5,000-£15,000)
  • ✅ Faster (2-4 weeks vs 6-18 months)
  • ✅ Preserves relationship

Cons:

  • ❌ Not legally binding (unless formalized)
  • ❌ Requires neighbour's cooperation

Step 2: Legal Action (£5,000-£15,000+)

When to Consider:

  • Neighbour unreasonably refuses (especially shared freehold)
  • Significant financial impact (EV essential for work)
  • Mediation failed

Legal Routes:

A. Easement Modification Application (Freehold)

Process:

  • Apply to Upper Tribunal (Lands Chamber) to modify easement
  • Argue: Original easement should include modern uses (EV charging)
  • Grounds: Section 84 Law of Property Act 1925

Costs: £5,000-£15,000 (legal fees, court fees)

Success Rate: 20-30% (courts reluctant to modify property rights)

Timeline: 6-18 months

B. Section 14 TOLATA Application (Shared Freehold)

Process:

  • Apply to County Court under Trusts of Land and Appointment of Trustees Act 1996
  • Argue: Co-owner unreasonably withholding consent
  • Grounds: Section 14 (Court can make order for sale or use of property)

Costs: £3,000-£8,000

Success Rate: 40-50% (if refusal clearly unreasonable)

Timeline: 4-12 months

C. Leasehold Tribunal (Leasehold)

Process:

  • Apply to First-tier Tribunal (Property Chamber)
  • Challenge freeholder's unreasonable refusal or excessive consent fees
  • Grounds: Landlord & Tenant Act 1985, Section 19

Costs: £100 application fee + £500-£2,000 legal advice

Success Rate: 60-70% (if refusal clearly unreasonable)

Timeline: 3-6 months

Step 3: Alternative Solutions (Avoiding Legal Route)

If negotiation and legal routes fail:

Option A: Portable Charger

Product: Portable EV charger (e.g., ZeroFly, Boostech)

  • No permanent installation required
  • Plugs into 13A socket (inside your home)
  • Extend cable to car (up to 15m)
  • Charging speed: 2.3kW (8-10 miles per hour)

Pros:

  • ✅ No neighbour consent needed
  • ✅ Low cost (£200-£400)

Cons:

  • ❌ Very slow charging (3-5x slower than 7kW wall-box)
  • ❌ Cable runs through window/door (security risk, heat loss)

Option B: Public Charging Reliance

Strategy: Accept no home charging, rely on public network

  • Weekly rapid charge (30-45 minutes)
  • Workplace charging (if available)
  • Destination charging (supermarkets, gyms)

Annual Cost: £1,200-£2,000 (vs £200-£400 home charging)

Option C: Move House (Extreme)

When Sensible:

  • EV essential for work/lifestyle
  • Neighbour relationship irreparably damaged
  • Long-term unsustainable public charging costs

Cost: £5,000-£15,000 (moving costs, stamp duty, legal fees)


Special Scenarios

Scenario A: Shared Driveway with 3+ Properties

Challenge: Requires consent from multiple neighbours

Strategy:

  1. Group proposal: Propose shared charging hub (3-4 chargers)
  2. Cost-sharing: Each property contributes £300-£500
  3. Council grant: Some councils offer grants for communal chargers
  4. Professional management: Charge management company handles billing

Success Rate: 40-50% (more complex, but shared benefit helps)

Scenario B: Absentee Neighbour (Buy-to-Let)

Challenge: Neighbour doesn't respond (lives elsewhere, rents property)

Strategy:

  1. Trace owner: Land Registry title search (£3)
  2. Certified letter: Send proposal via Royal Mail Signed For
  3. Contact tenant: Ask tenant to forward to landlord
  4. Follow up: Phone calls, emails (document all attempts)
  5. Legal advice: After 3 months no response, consult solicitor

Outcome: Most absentee landlords consent (low-effort, adds value)

Scenario C: Hostile Neighbour Relationship

Challenge: Pre-existing dispute, neighbour refuses on principle

Strategy:

  1. Third-party intermediary: Mutual friend, family member
  2. Financial incentive: Generous annual license fee (£300-£500)
  3. Mediation: Professional mediator addresses underlying issues
  4. Legal route: If unreasonable refusal, consider tribunal/court

Outcome: 30-40% reach agreement (hostility harder to overcome)


Frequently Asked Questions (FAQ)

1. Can I install an EV charger without neighbour consent if I have right of way?

No (in most cases). "Right of way" typically grants access only, not infrastructure installation. Running cables or mounting chargers requires explicit consent or co-ownership rights.

Exception: If your easement specifically grants "right to install utilities" or similar broad wording, you may have a case—consult a property solicitor.

2. Can my neighbour charge me for consent to install an EV charger?

Yes (if reasonable). Neighbour can request:

  • Reasonable compensation: Annual license fee (£100-£300), one-time payment (£500-£1,500)
  • Excessive fees: Demands for £5,000+ likely unenforceable

Legal position: Courts may deem excessive fees "unreasonable withholding of consent" (especially shared freehold).

3. What if my neighbour agrees verbally but later changes their mind?

Risk: Verbal agreements are hard to enforce for property rights.

Solution: Always formalize in writing:

  • Signed Neighbour Consent Agreement
  • Witnessed by independent third party
  • Registered as legal document (optional: deed of grant, £200-£500 legal cost)

If they withdraw consent after installation: Breach of agreement—legal action for damages (£2,000-£10,000 recovery).

4. Can I claim OZEV grant if I have a shared driveway?

Yes (if you have dedicated off-street parking):

  • ✅ Shared driveway with your own parking space: Eligible
  • ✅ Communal parking with numbered/allocated bay: Eligible
  • ❌ Shared driveway with no dedicated space: Ineligible

OZEV requirement: "Dedicated off-street parking" (not public road).

5. What if my freeholder charges excessive consent fees for EV charger?

Challenge via First-tier Tribunal:

  • Landlord & Tenant Act 1985, Section 19: Consent fees must be reasonable
  • Reasonable: £100-£500 (admin, legal review)
  • Unreasonable: £1,000+ (likely overturned by tribunal)

Application: £100 tribunal fee, 3-6 month process, 60-70% success rate.

6. My neighbour installed a charger without asking—can I demand removal?

Yes (if on your property or affects your rights):

Steps:

  1. Written demand: Recorded delivery, request removal within 14 days
  2. Negotiation: Offer to formalize arrangement (may save legal costs)
  3. Legal action: If refused, apply for injunction (£2,000-£5,000)

Court will likely order: Removal + compensation for trespass.


Summary: Shared Driveway EV Charging Action Plan

Week 1-2: Understand Your Legal Position ✅ Obtain property deeds (Land Registry, £3) ✅ Identify ownership structure (freehold, shared freehold, leasehold) ✅ Consult solicitor if unclear (£150-£300)

Week 3: Informal Approach ✅ Friendly conversation with neighbour ✅ Gauge their EV interest ✅ Identify concerns early

Week 4-5: Formal Proposal ✅ Written proposal (use template above) ✅ Address liability, visual impact, property value ✅ Offer cost-sharing or compensation

Week 6: Face-to-Face Negotiation ✅ Discuss concerns, offer compromises ✅ Emphasize mutual benefit ✅ Explore shared charger option

Week 7-8: Formalize Agreement ✅ Draft Neighbour Consent Agreement (use template) ✅ Legal review (£150-£300) ✅ Both parties sign, witness

Week 9-10: Installation ✅ Notify neighbour of date ✅ Professional installation ✅ Provide certificates, insurance proof

Ongoing: Maintain Goodwill ✅ Keep charger clean, cables tidy ✅ Communicate changes ✅ Respect shared space

If Negotiation Fails: ⚠️ Consider mediation (£400-£1,200, 2-4 weeks) ⚠️ Legal action as last resort (£3,000-£15,000, 4-18 months) ⚠️ Alternative solutions (portable charger, public charging)


Bottom Line: While shared driveway EV charging adds legal complexity, 85-90% of neighbours consent when approached reasonably. The key is understanding your legal rights, addressing concerns proactively, and formalizing agreements in writing. With patience, goodwill, and fair cost-sharing, most shared driveway disputes reach successful resolution.


Related Resources:

Last updated: February 2025

James Mitchell

James Mitchell

Lead Technical Writer
NICEIC Qualified ElectricianPart P Registered

James is a NICEIC-qualified electrician with over 15 years of experience in the UK electrical industry. He specialises in EV charger installations and has personally overseen 500+ home charging setups across England and Wales.

Related Articles

Continue your wellness journey with these hand-picked articles

Popular Articles

6 articles